/
Status and Progress

Status and Progress

Out of the box sticky types with the function “work item” will show a status.

Check out Work Item | Status Indicator

Out of the box piplanning.io provides 3 status

Sync Status with ALM-tool

If you’re having your session synced with an ALM-tool the status options will be pulled based on the workflows used in your ALM tool.

Status options pulled based on the workflow in Jira

ALM-tool specifics

Every ALM-tool handles status differently. Check out the pages provided below:

Jira

Jira Status Sync

Azure DevOps

ADO Status Sync

Rally

Rally Status Sync

Show Progress 🚀

Based on the linking between team level sticky types (i.e. User Story) to program level sticky types (i.e. Feature) you can now show and hide a progress bar.

The progress bar is based on the sticky count and the status (Categories To Do, In Progress, Done)

Show / Hide Progress

Progress visualisation

🟢 Done | 🔵 In Progress | ⚪️ To Do (gray) | ⚪️ Undefined (white)

 

Related content

Jira Status Sync
More like this
ADO Status Sync
More like this
Sticky Notes with Objectives
Sticky Notes with Objectives
Read with this
Jira backlog board sync [ST]
Jira backlog board sync [ST]
More like this