/
Rally Status Sync
Rally Status Sync
If your session is synced with Rally, also the status will be synced.
piplanning.io pulls in the existing states of every workflow used for mapped work items.
As portfolio-item states are not mapped to a schedule state (status category) they are not mapped to a piplanning app status category color and shown as empty.
Examples
Feature on program level
States of a portfolio-item in Rally
Status for a program level work item
User Story on team level
Flow-states of a team level work item in Rally
Status for a team level work item
Changing a status
Status changes in Rally are instantly reflected in the piplanning app.
Status changes in the piplanning app are instantly reflected in Rally (might need a page refresh).
Changing flow states in Rally
In case any of the flow states used for one of the sticky types in the piplanning app are changed in Rally, make sure that you do a manual reload in the rte cockpit.
Manually reload states in Rally in case of any change
, multiple selections available,
Related content
ADO Status Sync
ADO Status Sync
More like this
Jira Status Sync
Jira Status Sync
More like this
Rally Team Boards Sync
Rally Team Boards Sync
More like this
Team-mapping
Team-mapping
More like this
Rally Backlog Board Sync
Rally Backlog Board Sync
More like this
Rally Iteration Mapping
Rally Iteration Mapping
More like this